Step 1 — Design
- Select Size (Two bed or Three bed)
- Select Layout (C, Z, L)
- Select Finishes/Color (Interior and Exterior)
- Select Quantity
Step 2 — Deposit
- Contact HiFAB to complete the order form
- Connect with HiFAB preferred lenders ready to work with you
- 10% deposit to reserve place in line, increase to 50% deposit when loan secured
Step 3 — Dream
- Once a 50% deposit is received, now it’s time to dream of where your HiFAB home will reside (“Build Site”)
- Email your survey of where HiFAB will place the foundation prior to delivery
- You should only need to retrieve the following local government approvals:
- To allow HiFAB to install foundation on Build Site
- To allow you to bring utilities to Build Site
Step 4 — Deliver
- Track on the HiFAB website where your home “sits” on the factory floor
- HiFAB will arrive at Build Site days prior to delivery of home in order to pour foundation and to prepare for connections
- Day of delivery HiFAB will “Crane Set” your home and tie into the connections and apply exterior final touches…all within 7 days or less.